Bridges of 240 Tons
<< BACKDESCRIPTION
Construction of two (2) bridges for Canadian Royalties Inc., for the nickel mining industry in Nunavik.
LEAD TIMES
Three (3) months have elapsed, from technical specifications and drawings to transhipment for transportation to the far north of Quebec..
SPECIFICATIONS (EACH BRIDGE)
Length : 205 feet
Weight : 240 tons
Track for service vehicles : 65 tons capacity
Conveyor : Ore loading conveyor.